Bauplaner bei der Arbeit

PERFECTLY SOLVED FOR YOUR CLIENTS AND FOR YOU.

With the HRV Hokkaido fresh air heat exchanger, you ensure optimal fresh air supply for your clients' properties with high cost-effectiveness - both in installation and operation. Additionally, as a construction company, you can install the HRV Hokkaido by yourself without special expertise.

We, at Passive Energy, support you in the professional planning, ensuring that perfect air exchange with heat recovery is guaranteed for your properties.

Bauplaner bei der Arbeit

EASY INSTALLATION, STEP BY STEP.

1

First, a hole is drilled into the raw brick wall, and the installation pipe is laid in it.

2

Meanwhile, as part of the general electrical installation work, the wiring for the power supply of the fan unit and control is prepared.

3

After the plastering work, the assembly of the stainless steel exterior hood is done initially.

4

Then, the fan unit with the integrated heat exchanger is inserted into the installation pipe and connected to the power wiring.

5

Finally, the assembly of the interior cover, including the filter, is carried out.

Lüftereinheit und Wärmespeicher

Fan unit and heat storage

The powerful DC motor of the patented GAUß FAN 03, together with the ceramic heat storage, forms the core of the our HRV Hokkaido fresh air heat exchanger.

With a maximum of 1.6w/h, it impresses with extremely low energy consumption. The shaft of the GaussFan03 consists of double, rust-free steel ball bearings, making it particularly low-noise. An integrated microchip guarantees stable operation.

Product details

Wandbefestigung

Wall mounting

Made of stainless steel V2A, brushed, or powder-coated aluminum, white, RAL NNNN (without illustration); 191x191 mm

Einbaurohr

Installation pipe

made of PVC, 5.5 mm
Ø 165 mm, I = 500 mm

Außenhaube

Exterior cover

Made of stainless steel, V2A, brushed,
Thickness: 0,8 mm
Dimensions: 226x220 mm (hxb)

Innenabdeckung

Interior cover

Made of stainless steel, V2A, brushed or powder-coated aluminum, white, RAL NNNN (without illustration); 278x278 mm

Standardfilter

Standard filter

fine dust and pollen filter, or antibacterial filter

Zentralregler

Central controller VMPX-N

For intuitive handling. A control light indicates automatically when a filter replacement is due. Interval between supply and exhaust air: 70 sec.

Zentralregler

Central controller VMPX-NH

It guarantees stable room humidity of 40-60% RH. This is achieved by regulating the cycle between supply and exhaust air through a humidity sensor.

Zentralregler

Central controller - AQ

It prevents an excessive CO₂ concentration in the indoor air and also keeps the potential viral load low. A sensor on the controller monitors the CO₂ level. When necessary, the Hokkaido 401 switches to a higher ventilation level.

Technical Data

Fan unit
Gauß Fan03
Heat recovery
95%
Power consumption (MAX)
1,6 Wh
Relative power consumption
0,02 W/m3 • h
annual operationg cost per Unit (1kWh = 0,29€)
1,53€
Heat storage
Honeycomb ceramics Cartridge Type
Diameter of heat storage
150 mm Ø
Required wall thickness (KK2)
150 ~ 460 mm
Sound level difference in relation to volume flow
9 dB(A) at 16 m3/h (3m acc.)
Outer dimensions of installation tube
165 mm Ø

Our product in comparison - GET-Database

A database for building energy technology products, which is maintained by Energieberatung Salzburg and is used by building owners, product manufacturers and suppliers as well as funding agencies.